Sign In | Join Free | My wneducation.com
China Hongya Power Generating Equipment To Utilities Limited logo
Hongya Power Generating Equipment To Utilities Limited
tailored solutions to meet the customers requirements
Verified Supplier

4 Years

Home > Turgo Impulse Turbine >

4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine

Hongya Power Generating Equipment To Utilities Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine

  • 1
  • 2

Brand Name : Wawushan

Model Number : SF-018

Place of Origin : China

MOQ : 1

Price : negotiable

Payment Terms : T/T

Supply Ability : 1+unit+4 months

Delivery Time : 180 wordking days

Packaging Details : plywood

shaft : forged steel

layout : vertical

insulation class : F/F

excitation : brushless

voltage : 400v

capacity : 4000kw

Contact Now

4000kw Hydroelectric Electricity For Micro Hydro Power Plant

overview

Hydro turbine generator is droved directly or indirectly by hydro turbine. The rotating speed is less than 1500r/min, with horizontal and vertical arrangement. Excitation mode with brushless and static silicon type.

Components including stator, rotor,base frame, bearing, excitation motor or collecting ring. The outlet voltage from 400V to 13.8KV, and frequency could be 50Hz or 60Hz, output from 50Kw to 50Mw. Our generator are high efficiency, reliable, manufacture and tests all follow related IEC standards.

Hydro-generating unit is the key power equipment in the hydropower plant.

The hydro generator is a device that converts the rotating mechanical energy of a hydro-turbine into electrical energy through a main shaft connected to the hydro-turbine runner. two different mount for generator of vertical and horizontal which could be operated at brushless excitation and thyristor excitation. the hydro generator has usually used air as medium to cool its stator, rotor winding and iron core.

A hydraulic turbine converts the energy of flowing water into mechanical energy. A hydroelectric generator converts this mechanical energy into electricity. The operation of a generator is based on the principles discovered by Faraday. He found that when a magnet is moved past a conductor, it causes electricity to flow. In a large generator, electromagnets are made by circulating direct current through loops of wire wound around stacks of magnetic steel laminations. These are called field poles, and are mounted on the perimeter of the rotor. The rotor is attached to the turbine shaft, and rotates at a fixed speed. When the rotor turns, it causes the field poles (the electromagnets) to move past the conductors mounted in the stator. This, in turn, causes electricity to flow and a voltage to develop at the generator output terminals."

Specification

Name 4000kw Hydroelectric Electricity
Capacity2 4000KW
Frequency 50HZ
Generator Voltage 6300V
Layout pattern horizontal
Material(coil) copper
Excitation Brushless
Generator Insulation F/F
Lifespan 60 years

our service package for power plant

1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b.Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(

4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine

4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine

4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine

4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine


Product Tags:

4000kw Turgo Impulse Turbine

      

Micro hydro power plant turbine

      

Turgo Impulse hydro plant turbine

      
Buy cheap 4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine product

4000kw Water Electricity Turgo Impulse Turbine Micro Hydro Power Plant Turbine Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hongya Power Generating Equipment To Utilities Limited
*Subject:
*Message:
Characters Remaining: (0/3000)